Skip to product information
1 of 9

Garden & Play

Walk-in Greenhouse for Outdoors with Steel Frame

Walk-in Greenhouse for Outdoors with Steel Frame

Regular price £43.99 GBP
Regular price £54.99 GBP Sale price £43.99 GBP
Sale Sold out
Taxes included.
Quantity

Does unpredictable weather ruin your gardening plans and leave your plants vulnerable? The fear of a sudden storm destroying your delicate sprouts can be disheartening. Greenhouse from offers a spacious 160 x 160 x 200 cm sanctuary. Its reinforced steel frame provides robust stability against the wind, while three mesh windows and a large roll-up door in this small greenhouse ensure your plants breathe easy, giving you peace of mind and a flourishing garden.

Features:

  • This spacious 160W x 160D x 200H cm walk-in greenhouse offers generous room for tall plants
  • Features a reinforced steel frame with ground stakes and ropes for wind resistance
  • A large roll-up door and three windows ensure excellent ventilation and easy access
  • The water-repellent PE cover protects your plants from wind and rain
  • Includes a ground sheet to effectively prevent weed growth and keep the inside clean
  • Suitable for your garden or patio, designed for an enhanced gardening experience
  • Assembly required

Specification:

  • Colour: White, Dark Green
  • Material: Steel, PE
  • Overall Dimension: 160W x 160D x 200H cm
  • Window Dimension: 40W x 40H cm, 50/34W x 40H cm
  • Door Dimension: 160W x 194H cm
  • Windproof: Level 4 (wind speed below 17.5 mph)

Package Includes:

  • 1 x Greenhouse
  • 4 x Guy rope
  • 4 x Ground Stake
  • 1 x Manual
View full details